IRAQ-Baiji Refinery - 2007
Home » Projects » IRAQ-Baiji Refinery - 2007
   
Location Client Project Name
Baiji – Iraq

 North Refineries Co 

IRAQ-Baiji Refinery - 2007
 
Engineering procurements fabrication, civil works and construction for 9 storage tanks at Baiji refinry - Iraq. The project include fixed & floating roof storage tanks.
 

1- Naphta Facility

• 2*17,500 m3 floating roof Storage Tank
D = 36.5m, H = 14.8m, CS /ST37-2

2- Reformate Facility

• 2*4500 m3 floating roof Storage Tank
D = 19.88m , H = 16.1 m, CS / ST37-2

3- Gas Oil Facility

• 2*27000 m3 fixed roof Storage Tank
D = 43.9m , H = 18.4m, CS / ST37-2

4- Vacuum Residue Facility

• 1*25000 m3 fixed roof Storage Tank
D = 42.25m , H = 18.4 m, CS / ST37-2

5- Light Gas Oil Facility

• 1*32500 m3 fixed roof
D = 48.9m, H = 18.4m, CS / ST37-2

6- Undersulphrised Kerosene Facility

• 1*26500 m3 fixed roof Storage Tank
D = 44.8m , H = 18.4 m, CS / ST37-2
| Image 1 of 5 |

IRAQ-Baiji Refinery - 2007

© 2026 Developed by Blue Ray for Web Solutions. All rights reserved